S, FS, the SL series pumps installs the use and the matters needing attention and maintains
1nd, this pumps before the installment acts according to designated pumping, and installs the size according to the contour to complete the foot foundation, installs when acts according to the pipeline position the request, causes the installment as far as possible the position convenience management and the service.
2nd, installment position stomach spring body if is higher than the liquid level, must attach the attire to fill the fluid installment. After
3rd, pumps the pre-operational first to fill the liquid the full pump body to drive, strictly prohibits the non- medium revolving and reversing, otherwise the pump body internal cause lacks exudes the liquid cooling to damage the mechanical seal.
4th, stops when should close the fluid tube valve, avoids the liquid flowing backwards. 5th, the regular inspection, the electrical machinery magnitude of current, does not have to surpass the electrical machinery nominal current.
6th, the attention usually maintains, frequently inspects pumps moves whether steadily. Whether there is exceptionally vibrates, attention replacement elastic block. Regards the oil gauge to supplement the bearing the lubricating oil, regularly replaces in the rack the lubricating oil (general three months to have to trade 1 time). |